Customization: | Available |
---|---|
After-sales Service: | Video Technical Guidance |
Warranty: | 12month |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Cab | Flat top | Horsepower | 95HP |
Dimensions (mm) | 6670×2050×2600 | Driving form | Steering wheel /LHD |
Curb weight (kg) | 4200 | Total weight (kg) | 8495 |
Production cycle | about 30 days | Warranty | 12 month |
Cab | Dongfeng small Dorica D6 Cab; Reversible | ||
Front axle | 2.5 tons | ||
Rear axle | 5 tons | ||
Gearbox | 5-speed gearbox | ||
Vehicle frame | Through reinforced girder frame | ||
Tire | 7.00R16 type steel tire 6psc | ||
ABS | Have | ||
PTO interface | Have | ||
PTO | Have | ||
Front / rear overhang (mm) |
front:1040,rear: 2330 | ||
Departure corner | front:20,rear:17 | ||
suspension | Leaf spring 6/6+5 | ||
Number of axles | 2 | ||
Wheelbase (mm) | 3300 | ||
Number of tires | 6 | ||
Tread (mm) | 1485/1540 | ||
Drive type | 4*2 | ||
engine | CY4100Q | ||
Emission Standards | Euro II | ||
brake | Drum | ||
Braking System | Air brake | ||
Spare tire frame | Have | ||
light | Have | ||
Voltage | 12V | ||
Toolbox | Have | ||
colour | According to user requirements |
1. What is your MOQ?
A:One unit.
2. Can you meet my special requirements?
A:Sure! We are a direct manufacturer, we have strong production capacity and research and development capabilities!
3. How is the quality of your products?
A:High quality has always been our advantage. We all use high-quality branded materials with 100% quality assurance. A procedure is established to inspect products, raw materials, process materials, finished materials that have been verified or tested, etc.at all stages of the manufacturing process.
4. How can I get the price of your vehicle?
A:You can contact us through any of the following contact methods. Our personalized service staff will reply you within 24 hours.
5. Is it possible to print our own brand on the vehicle?
A:It's totally acceptable.
6: What is the delivery time?
A:The delivery time is within 30-50 working days after receiving your prepayment.