Product Parameters
12-tube bundle container |
Execution standard : ISO11120 Cylinder-design , structure and test of seamless and reusable steel tube with a capacity between 150 L to3000 L .ISO 668 Classification , dimensions and ratings of series 1 container |
Tube Bundle Container |
Item |
Data |
Cylinder |
Item |
Data |
Type |
GSJ12-2210-H2-25 |
Working pressure |
25MPa |
Container quality |
37028Kg |
Working temperature |
-50~65ºC |
Filling quality |
536Kg |
Main material |
4130X |
Rated weight |
37564Kg |
cylinder QTY |
12 |
Filling medium |
H2 |
Total volume |
26.52M3 |
Gas tightness test pressure |
25MPa |
Pressure for water pressure test |
37.5MPa |
Pipeline water pressure test pressure |
37.5MPa |
Dimension(mm) |
559x17.4x10975 |
Filling amount |
5967Nm3 |
Design temperature |
65ºC |
Dimension (mm) |
12192x2438x2000 |
Medium property |
Explosive |
Transporting |
Highway combined transport |
|
|
Design service life |
Fifteen years |
Bursting discs |
Burst pressure |
37.5MPa |
|
|
Bursting disc device discharge aperture |
≥20 |
|
|
|
|
|
|
Detailed Photos
Our Advantages
1.This frame tank container should carry out all kinds of the test according to the GB / T16563-1996 and China Classificationm Society "Container Inspection Code".
2.Except for the pictures' mark, the type and size of the welded structure shall be in
accordance with GB / 985.1. The height of the weld foot and weld fillet is according to the thickness of the less thinner steel plate.There should not be crack, slag, porosity, or undercut, etc. on the surface of the welded joint.Weld seam surface will be inspected through the magnetic powder or penetration testing (preferred magnetic powder). Meet NB / t47013.4 (5) -2015, Class I qualified.
3.The accessories for this tank container shall meet the corresponding standards of product quality certification,which can be carried out the air tightness test together with the tank after passing the re-examination and form a complete set then delivery from the factory;
4.Valve opening operation,should be able to withstand the pressure of the air tightness test , fully open, fully closed, flexible operation, no abnormal resistance, idling and so on;
5.All signs, brand names, stickers will be made according to the drawings after the competion of the painting; The area around the signs, brand names and rivets will be sealed with the sealant.
6.The vertical plane of the longitudinal centerline of the tank container shall be coincident with the vertical plane of the longitudinal centerline of the frame. The offset shall not exceed 5mm.
7. All supports of the connections between the tank and the frame should be thin welding, and welding firm and reliable, the weld seam surface shall not have cracks, undercut, stomatal, crater and splash.
8. Tank coating in line with the relevant provisions of JB / T4711-2003. After complete cleaning the rust of the outside carbon steel surface of the tank,coated two anti-rust primer, two white finish.
9. The tank needs to be replaced with nitrogen or vacuumed before leaving the factory.
(1) the use of nitrogen replacement treatment, the oxygen content after treatment is less than 3%, and keep the residual pressure 0.05Mpa ~ 0.1Mpar;
(2) the use of vacuum treatment, the vacuum after treatment is not less than 0.086Mpa.1010. Emergency cut-off device should be installed before the air tightness test, the test medium is air, the test pressure is 0.1Mpa;After the installation is complete,Emergency shut-off device should be done through emergency cut off and filter protection test, gas valve, liquid valve and boostervalve completely closed in 5S qualified, air source control valve rotation flexibility, no jamming phenomenon.