Customization: | Available |
---|---|
Certification: | ISO9001, ECE, CE |
Material: | Carbon Steel for ISO Tank |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Dimension of the 40FT 40.44CBM LNG Tank Container with BV&T75 | ||||||
Description and Specification of Commodity | ||||||
Codes and regulations for this Tank container | TSG R0005-2011 <Mobile Pressure Vessel Safety Technical Inspection Regulations>, "International Maritime Dangerous Goods Code" (IMDG CODE) JB / T4780-2002 "Liquefied Natural Gas Tank Containers", Container Inspection Code-2012 |
|||||
Guidelines for tank container for this Tank container | T75 | |||||
Container Type for this Tank container | 1AA | |||||
Rated weight for this Tank container | 32723kgs | |||||
Maximum Allowed Loading Weight for this Tank container | 14700kgs | |||||
Tare weight for this Tank container | 18023kgs | |||||
Allowed stacking weight for this Tank container | 192000kgs | |||||
Manufacturing license level for this Tank container | Inside tank | C3 | ||||
outside tank | ||||||
Max. Working Pressure(Mpa.) for this Tank container | Inside tank(MPa) | 0.7 | ||||
outside tank(MPa) | -0.1(Vacuum) | |||||
Min. Working Tempretrues for this Tank container | Inside tank | -162 °C | ||||
outside tank | -20°C | |||||
Design Pressure(Mpa.) for this Tank container | Inside tank | 0.8 | ||||
outside tank | -0.1/0.2 | |||||
Design Tempretrues for this Tank container | Inside tank | -196 °C | ||||
outside tank | 50 °C | |||||
The Main material for this Tank container | Cover | inside tank | S30408 | |||
outside tank | Q345R | |||||
Shell | inside tank | S30408 | ||||
outside tank | Q345R | |||||
Overall Size(Frame)/L*W*H/mm for this Tank container | 12192*2438*2591 | |||||
Media for this Tank container | Inside tank | LNG | ||||
Media Characteristics for this Tank container | Inside tank | explosive | ||||
Paint for this Tank container | Frame | 30µm +40µm +50µm | ||||
Shell | 30µm +40µm +50µm | |||||
Total Volume(L) for this Tank container | 40440 | |||||
Effective volume(L) for this Tank container | 36400 | |||||
Rated filling rate for this Tank container | 90% | |||||
Corrosion allowance for this Tank container | Inside tank | 0mm | ||||
outside tank | 1mm | |||||
Air tightness test pressure(Mpa) for this Tank container | Inside tank | 0.8mm | ||||
outside tank | 0.2mm | |||||
Air pressure test pressure for this Tank container | Inside tank(MPa) | 0.92 | ||||
Welding joint coefficient for this Tank container | Inside tank | 1 | ||||
outside tank | 0.85 | |||||
Static evaporation rate for this Tank container | Inside tank | <=0.18 | ||||
Material density(kg/m3) for this Tank container | Inside tank | 426 | ||||
Natural boost rate for this Tank container | Inside tank | <=13 | ||||
Main hazard category for this Tank container | 2.1 | |||||
Design service life for this Tank container | 15 years | |||||
Mode of transportation for this Tank container | Road,Sea or Railway | |||||
Adiabatic form for this Tank container | High vacuum multilayer insulation | |||||
Emergency cut-off valve for this Tank container | Type | Gas phase | KDJ661F-16P | |||
liquid phase | KDJ661F-16P | |||||
Nominal pressure | Gas phase(Mpa) | 1.6 | ||||
liquid phase(Mpa) | 1.6 | |||||
Nominal Diameter | Gas phase | DN50/DN32 | ||||
liquid phase | DN50 | |||||
Operation way | Gas phase | Pneumatic motion control | ||||
liquid phase | Pneumatic motion control | |||||
Fusible temperature for the Fusible alloy of the fusible plug(°C) | 70+/-5 | |||||
Safety valve for this Tank container | Type | ZA25-5B | ||||
Mode | Low temperature modular safety valve | |||||
Level gauge for this Tank container | Type | ZK-1.5-6-1 | ||||
Mould | CYJ-1 Double liquid column pressure difference level gauge | |||||
Nominal pressure(Mpa) | 1.6 | |||||
Nominal Diameter | DN6 | |||||
Measuring range(Kpa) | 0~15 | |||||
Precision | >=2.5 | |||||
Loading and unloading device for this Tank container | Gas phase joint | Type | Flange connection | |||
Nominal Diameter | DN50 | |||||
liquid phase joint | Type | Flange connection | ||||
Nominal Diameter | DN50 | |||||
Pressure gauge for this Tank container | Type | YN-100 | ||||
Measuring range(Mpa) | 0~1.6 | |||||
Precision | 1.6 Class | |||||
Shell blasting device for this Tank container | Burst pressure(Mpa) | <=0.1 | ||||
Nominal Diameter | DN80 | |||||
Type | YEJ80-0.1-50 | |||||
Orifice table | ||||||
symbol | Nominal Size | Nominal Pressure | Tube Size | Purpose and Name | Connection standard and Type | |
CZ1 | 50 | 40 | Ø57*3.5 | liquid phase entrance | HG/T20592-2009 | |
CZ2 | 50 | 40 | Ø57*3.5 | Gas phase entrance | HG/T20592-2009 | |
CZ3 | 32 | 40 | Ø38*3 | Supercharger liquid phase entrance | HG/T20592-2009 | |
j | 80 | / | / | Shell explosion-proof port | / | |
Technical Requirements | ||||||
1. | This frame tank container should carry out all kinds of the test according to the GB / T16563-1996 and China Classification Society "Container Inspection Code". | |||||
2. | Except for the pictures' mark, the type and size of the welded structure shall be in accordance with GB / 985.1. The height of the weld foot and weld fillet is according to the thickness of the less thinner steel plate.There should not be crack, slag, porosity, or undercut, etc. on the surface of the welded joint.Weld seam surface will be inspected through the magnetic powder or penetration testing (preferred magnetic powder). Meet NB / t47013.4 (5) -2015, Class I qualified. | |||||
3. | The accessories shall meet the corresponding standards of product quality certification,which can be carried out the air tightness test together with the tank after passing the re-examination and form a complete set then delivery from the factory; | |||||
4 | Valve opening operation,should be able to withstand the pressure of the air tightness test , fully open, fully closed, flexible operation, no abnormal resistance, idling and so on; | |||||
5 | All signs, brand names, stickers will be made according to the drawings after the competion of the painting; The area around the signs, brand names and rivets will be sealed with the sealant. | |||||
6 | The vertical plane of the longitudinal centerline of the tank shall be coincident with the vertical plane of the longitudinal centerline of the frame. The offset shall not exceed 5mm. | |||||
7 | 7. All supports of the connections between the tank and the frame should be thin welding, and welding firm and reliable, the weld seam surface shall not have cracks, undercut, stomatal, crater and splash. |
|||||
8 | 8. Tank coating in line with the relevant provisions of JB / T4711-2003. After complete cleaning the rust of the outside carbon steel surface of the tank,coated two anti-rust primer, two white finish. | |||||
9 | 9. The tank container needs to be replaced with nitrogen or vacuumed before leaving the factory. (1) the use of nitrogen replacement treatment, the oxygen content after treatment is less than 3%, and keep the residual pressure 0.05Mpa ~ 0.1Mpar; (2) the use of vacuum treatment, the vacuum after treatment is not less than 0.086Mpa. |
|||||
10 | 10. Emergency cut-off device should be installed before the air tightness test, the test medium is air, the test pressure is 0.1Mpa;After the installation is complete, Emergency shut-off device should be done through emergency cut off and filter protection test, gas valve, liquid valve and booster valve completely closed in 5S qualified, air source control valve rotation flexibility, no jamming phenomenon. |